Project Details
Location: New Windsor, MarylandOwner: Lehigh Cement
Products Used
- Reinforced Earth®This MSE wall, finished in 2016, reaches a height of over 40 feet. Referred to as a truck dump wall or crusher wall, this is a common application on mining and aggregate processing sites. The MSE wall is constructed to a height that allows a heavily loaded truck to dump material from the top of the wall into a crushing or conveyance operation below.